Sorry but this form will not work without cookies enabled. Please adjust your browser settings to enable cookies to continue. For more information on how to do this please see our.

  • Welcome to Collège Champittet

    Collège Champittet in Pully has been providing outstanding education to both local and international students for over 110 years

    Our School

  • High quality education

    We welcome students from 3 to 18 years providing preschool, primary and secondary education

    Student Life

  • A home away from home

    We welcome boarding students from the age of 12, providing a safe and welcoming environment in our small family-size boarding house

    Boarding

  • Summer of Excellence

    Our summer camp enhances a students' learning and development in a fun and inspiring way.

    Summer Camp students reach the summit

  • Admissions at Collège Champittet

    Our admissions are open throughout the year, do not hesitate to get in touch with us!

    Admissions

  • Find out what is happening at school

    Have a look at what is happening, read our newsletters and check out our photo gallery!

    News and Insights

  • Welcome, Champittet Alumni

    The Champittet spirit is an indissoluble link that connects us all !

    groupe of students using computers and ipads

There is something new at the College!

During the summer holidays, we worked very hard to do important renovations at the school.

In the Saint Bernard building, the fourth floor has been given a fresh new look to give the corridors some light and is now equipped with new tables and chairs. A new STEAM room (science, technology, engineering, art, maths) has been set up with super new equipment that includes a 3D printer, iMac and configurable furniture. The gym has also been completely refurbished and furnished to better accommodate events held at the school and a new floor on the junior playground has been installed. Finally, a new dance hall and extracurricular activities room has been set up in the St Augustin building next to the dining rooms.
Less visible but important to mention anyway, major water separation works that will take place in Champittet and the surrounding area for about 2 years began during the summer holidays. This is a big project to relieve sewage treatment plants by separating sewage from rainwater, which can go directly into the lake. We are off to a good start with the year’s theme of sustainable development!

  • nouveautes_1-OK
  • nouveautes_2-OK
  • nouveautes_3-OK